爱词霸英语   汉语   手机版   软件版下载 | English
每日一句:正在加载...
1.with thefast development of modern molecular biology technique and image technique, detecting DNA of HSV-1 with PCR(polymerase chain reaction) has become gold standard of diagnosis of HSE. MRI(magnetic resonace imaging) can show inflammatory change of temporal lobe in HSE at its early stage,which makes clinically fast and accurate diagnosis of HSE possible. All of these bring forward demanding for valid cure of HSE urgently.
随着现代分子生物学技术以及影像技术的迅猛发展,用PCR技术对HSV-1病毒DNA进行检测已替代脑组织活检成为HSE诊断的金标准以及MRI在HSE的早期就能发现颞叶的炎症性改变,使得临床快速、准确的诊断HSE成为可能,这就为有效治疗HSE提出了迫切的要求。收藏指正
2.The content of Bt (Bacillus thurngiensis Berliner) insecticide protein (BtIP) in thunbergs was studied by ELISA in laboratouy. The results showed that there were obvious spatio-temporal changes of the contents of BtIP along the development process of Bt transgenic cotton. The BtIP could been detected in second and fourth larvae during the cotton squaring stage to flowering stage, and the contents were 4.89ng/g and 13.36ng/g, respectively.
用ELISA法测定龟纹瓢虫体内Bt毒蛋白的含量,在棉花的蕾期-花期,33B转基因棉田的龟纹瓢虫2龄、4龄幼虫体内可以检测到Bt毒蛋白,含量分别为4.89ng/g、13.36ng/g,其它龄期检测不到Bt毒蛋白。收藏指正
3.The results show that in the later stage of the nucleation process, ① The maximum slip velocity is monotonically accelerating; ② The slipping hot spot (where the slip rate is maximum) migrates spontaneously from a certain instant, and such migration is spatially continuous; ③ When the maximum velocity reaches a detectable order of magnitude (at least one order of magnitude greater than the loading rate), the remaining time is 20 hours or more, and the temporal variation of slip velocity beyond this point may be used as a precursory indicator; ④ The average slip velocity is related to the remaining time by a log-log linear relation, which means that a similar relation between rate of microseismicity and remaining time may also exist; ⑤ When normal stress variation is taken into account, time scale of such processes can be extended by about 2 times.
结果表明,在成核的后期阶段:①最大位移速率单调加速增加;②滑动热点(最大滑动速率处)在后期阶段开始自发性迁移,且在空间上连续;③当最大滑动速率达到可以明显探测的量时(高于载入速率一个数量以上),倒计时间为20小时或更长一些,这时的速率变化可作为临震预测标志;④平均滑动速率与倒计时间的关系在临震阶段呈对数线性趋势,由此可推测微震活动增长率与倒计时间同样存在对数线性关系;⑤正应力的变化对上述时间尺度有延长作用,使之大致增加到原数值的2倍。收藏指正
尝试查询
汉英释义