2.Sets a temporary breakpoint at the nearest code position (visible with marks) thereafter the program runs and breaks at this location, as shown in Figure 3.67.
3.The size, location and number of the venues and facilities to be constructed will be reviewed and verified. Existing facilities that can be adapted or expanded for Olympic purpose will be used instead of building new ones, and temporary venues will be built in place of permanent ones.