爱词霸英语   汉语   手机版   软件版下载 | English
每日一句:正在加载...
1.First-stage Work of Nanjing Subway Project--Nanjing subway station, safely underpass railway station and yard through mining method, here is the introduction of the safety control technology involved: reinforcing station and yard track with temporary construction beam, shoring pipe shed in advance, and CRD tunneling,
介绍南京地铁一期工程南京站用矿山法通过铁路站场的安全控制技术,即站场轨道采用施工便梁加固,大管棚超前支护,隧道施工采用CRD法。收藏指正
2.Monitoring and Inspection of the Treatment Facilities of the Radioactive Pollution State Environmental Protection Administration conducted on-site monitoring and inspection on the operation of the treatment plants of the low and medium radioactive wastes in northwest, and on the temporary storage sites of the old directive cylinders of the reactors in Daya Bay Nuclear Power Station in Guangdong.
放射污染处置设施监督检查 国家环保总局对西北中低放射性废物处置场运行情况、广东大亚湾核电站堆内构件旧导向筒暂存场等进行了现场监督检查。收藏指正
3.Medium-medium regulator stations have been added for the temporary gas supply of coal gas transforming region in the west part of Xiamen city and the gas supply situation of new LPG/air mixing station in the northeast part of the city.
结合厦门市西部煤制气改造区域临时用气问题以及东北部新建空混站的供气情况,增设了中-中压调压站。收藏指正
尝试查询
汉英释义