1.The conversion rate from the surface M_2 to the internal tideenergy integrated over the whole model domain amount to 14GW, 8.5GW of which are found in the Luzon Strait, 2.1GW in the Taiwan Strait, 2.0GW in the northeast of the Taiwan Island, 0.2GW in the Dongsha Islands.