top-hole
2.Different drilling fluid systems have been used in the horizontal well drilling in North Tarim area, more specifically, polymer drilling fluid is used in the top hole of large size, and polysulfide drilling fluid for the lower interval; for the building section and horizontal interval, polysulfide drilling fluid Mixed with oil is used.

