1.Elementary Discussion of the Penstock Anchorage Block Design of High—head Hydropower Station
浅谈高水头水电站压力钢管镇墩设计收藏指正
2.The penstock can be divided into manual type, manual and electric type, electric type according to the headstock.
由启闭装置的不同型式可分为手动式、电动式、手电动式三种。收藏指正
3.The Strength and Deformation of Reinforced Concrete Penstock with Steel Lining Located on the Downstream Surface of Concrete Dam
混凝土坝下游面钢衬钢筋混凝土压力管道的强度和变形收藏指正
4.Influence of dam displacement and internal water pressure on the structural stresses of penstock laid on downstream face of dam
坝体变位和内水压力对坝后背管结构应力的影响收藏指正
5.Long and Large Pipe Shelf Construction Method in Overburden at Lower Horizontal Section of Penstock at Liziping Hydropower Station
栗子坪水电站压力管道下平段覆盖层长大管棚施工技术收藏指正
6.It is difficult to analyze combined work of underground penstock due to the gap among steel lining, concrete lining and rock.
摘要埋藏式压力钢管设计中,钢衬、混凝土衬圈和围岩之间普遍存在着不连续的缝隙,致使设计计算时难以进行联合受力分析。收藏指正
7.Parameters of contact layer are determined when deformation of contact layer is equal to initial gap which is proposed in the criterion of penstock.
另外,接触层参数可通过其变形与规范建议的初始缝隙相匹配的原则加以确定。收藏指正
8.The penstock chooses end face integral seal and the seal material is special rubber, which makes the seal safety and durable.
闸门采用端面整体密封,密封材料采用特殊橡胶材料,保证密封牢靠、耐用。收藏指正
9.Because concrete crack will greatly affect the security of concrete penstock in hydropower station, the paper applies the theory of global optimization method to predict the maximum concrete crack width in steel-lined reinforced concrete penstock and bring forward a predicting model based on the theory of artificial neural network (ANN).
摘要基于人工神经网络的全局优化方法的基本理论,对钢衬钢筋混凝土压力管道外包混凝土结构裂缝预测进行了研究,提出了基于神经网络的管道混凝土裂缝预测模型。收藏指正
10.In order to ascertain stress behavior of steel lined reinforced concrete pipe accurately, according to the fundamental principle of non-linear computation of reinforced concrete elements, the steel lined reinforced concrete penstock on downstream dam surface in a hydropower station is calculated and analyzed, and the distribution of circumferential stress of the steel lined reinforced concrete pipe is obtained, it proves that it is safe and reasonable to use structures of steel lined reinforced concrete penstock in hydroelectric station construction, and can satisfy the requirement of project.
摘要为了能够准确地把握钢衬钢筋混凝土管的受力性能,根据钢筋混凝土单元非线性计算的基本原理,对某水电站钢衬钢筋混凝土坝后背管进行了计算分析,得出了钢衬钢筋混凝土管环向应力的分布情况,分布情况说明了此水电站采用钢衬钢筋混凝土坝后背管的结构形式是安全合理的,可以满足工程要求。收藏指正
11.The penstock for Jinhe Hydropower Station is less in China, as it has a obliquity of 50° on the bending and inclined straight section in space; for which the manufacture and installation are smoothly completed under the construction condition in the tunnel and the environment of alpine region with available construction method in combination of limited construction method for the key technical problems of the manufacture and installation of the penstock, which provides a reference for the constructions under the similar circumstance.
摘要金河水电站压力钢管的空间转弯和斜直段的50°倾角在国内是比较少见的,针对钢管制造、安装的技术难点,在高寒和复杂的洞内施工环境中,结合有限的施工手段,采取有效可行的施工方法,顺利完成了制造、安装任务,对类似环境下的施工提供了一定的借鉴。收藏指正
12.The corrosion resistant plate penstock is in the frame of obvious-stem, which mainly consists of lifting device, frame, gate plate, seal, wedge block compressing set, rod and rod joint, rod guide tube, install accessory and etc.
不锈钢闸门为明杆式结构,主要由启闭装置、闸框、闸板、密封件、楔块压紧装置、门杆和杆接头、杆导架、安装附件等组成。收藏指正
13.Altogether 4 large collapses, 12 collapses with a height of over 3 m ,many small collapses and rockfalls happened during excavation of the power tunnel,the diversion tunnel,the underground penstock conduit and the construction adit.
户宋河电站引水隧洞、导流洞、地下压力钢管道及施工支洞,在施工过程中,共发生冒顶大塌方4段,最大塌高>3m的大塌方及冒顶计12段,小塌方及掉块很多。收藏指正
14.Taking the example in the three gorges hydroelectric station, we researched the influence of the weld process on the construction and operation of penstock after moving contract-elongate nodes, analyzed the deformation law of two plans and calculated the crosswise and lengthwise shrinkage in weld process using experience formula and theory respectively, and then analyzed the influence of the welding and installing process on shrinkage, finally chose the best installation plan.
摘要以三峡水电站引水压力钢管施工现场为实例,研究取消伸缩节后焊接对引水压力钢管施工的影响,分析了两种方案在焊接过程中的变形规律,分别用经验公式和理论计算出两种方案焊接时的横向和纵向收缩量,然后分析收缩量对安装焊接过程的影响,选择出最佳安装方案。收藏指正
15.A brief introduction to scientific research in the Three Gorges Project(TGP) and the applications of research achievements is given,which include treatment of newly slited layer on the foundation of the first stage earth-rock cofferdam,dumping bottom technique of river closure in deep water,construction of cut-off walls in the second stage earth-rock cofferdams,3-D computer simulation of river closure,concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete,deep sliding resistance and stability of the intake dam section,the section of the intake of the power station,the intake penstock of the power station,layout and hydraulics problems of shiplocks,stability of high slopes of shiplocks,and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700MW turbine generator units.
介绍三峡工程的科研项目,综述三峡工程开工以来的主要科研成果及工程应用情况,包括:一期土石围堰基础处理与施工技术;大江截流上下游土石围堰平抛垫底研究;二期围堰防渗工程研究;大江截流计算机科学管理;大坝混凝土浇筑方案及主要施工机械选型;混凝土的原材料和耐久性优化试验研究;大坝基础深层抗滑稳定研究;三峡电站进水口型式研究;钢衬钢筋混凝土引水管道研究;蜗壳打压、厂坝间伸缩节问题研究;永久船闸的引航道布置、输水系统及水力学、高边坡稳定、混凝土衬砌墙的结构与支护研究;特大型水轮发电机组的科学研究。收藏指正
16.Abstract: A brief introduction to scientific research in the Three Gorges Project(TGP) and the applications of research achievements is given,which include treatment of newly slited layer on the foundation of the first stage earth-rock cofferdam,dumping bottom technique of river closure in deep water,construction of cut-off walls in the second stage earth-rock cofferdams,3-D computer simulation of river closure,concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete,deep sliding resistance and stability of the intake dam section,the section of the intake of the power station,the intake penstock of the power station,layout and hydraulics problems of shiplocks,stability of high slopes of shiplocks,and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700MW turbine generator units.
文摘:介绍三峡工程的科研项目,综述三峡工程开工以来的主要科研成果及工程应用情况,包括:一期土石围堰基础处理与施工技术;大江截流上下游土石围堰平抛垫底研究;二期围堰防渗工程研究;大江截流计算机科学管理;大坝混凝土浇筑方案及主要施工机械选型;混凝土的原材料和耐久性优化试验研究;大坝基础深层抗滑稳定研究;三峡电站进水口型式研究;钢衬钢筋混凝土引水管道研究;蜗壳打压、厂坝间伸缩节问题研究;永久船闸的引航道布置、输水系统及水力学、高边坡稳定、混凝土衬砌墙的结构与支护研究;特大型水轮发电机组的科学研究。收藏指正