venture evaluation and review technique (VERT)
6.This paper describes the application potential and the feasibility of program evaluation and review technique in application software development.
7.This article estimats the risk in project plans with PERT (program evaluation and review technique) net technique.It provides a base for controlling project plans.
8.How to schedule highway engineering while considering influence of random factors was discussed, then, a new project planning technique considering effect of random factors was presented which classified those random factors and constructed different models to deal with different kinds of random factors using computer simulation technology and program evaluation and review technique (PERT).
9.The paper adopts the process management theory and compares several different projects planning methods, and selects the Critical Path Scheduling method of program evaluation and review technique as well as the Schedule & Cost optimizing method to create the project planning. It workouts a network planning to match the time limit for the project and analyzes all the elements, and further to find out the major factors influencing the Dalian Star Shopping Mall project.
10.Conflict resolution model and strategies for multi-agent hybrid systems on Integratable Manufacturing Execution System (I-MES)is researched in this paper. An architecture based on the multi-agent of I-MES is built firstly. In order to classify the occurring conflicts in the job-shop, Program Evaluation and Review Technique/Critical Path Method is introduced into the conflict analysis process.

