waterway transportation
6.The Construction Term : There is the solid transportation system formed by the aviation, the railhighway, the highway, the waterway, which is 1 hour driving apart from airport, 25 kilometers apart from 3 train stations,3 kilometers apart from the Chengdu-Leshan Highway, Leshan-Yibin Highway and Dajian Port for 500 tons.
7.Based on analysis and demonstration of model test, the problems of WenzhouBridge construction relating to stability of Qujiang Channel, vessel navigation adaptability andlocal scouring of channel, etc. were resolved properly, so that the coordination of bridgeengineering and chanel maintenance & water transportation development was guaranteed andboth bridge and waterway were benefited from the project.

