wrong post
1.Secondly, based on the predecessor’s study, some optimization and extension for the function of the preprocessing module of the cable dome optimal design’s system software are done, and simplified the complex method of the bar coding, and disabused some wrong bar coding, exploited the post-processing module including constructional pictures.

